The Dutilly Family: AT-AT Bed Complete!
AT-AT Bed Completed: The Next Generation Has Begun
Mission Complete!
All Terrain Armored Transport installed!
6-½ weeks, about 60 hours of work.
-
2X4 Framing, with ½" MDF top. CT was a huge helper
-
Basic Legs are 2X4 as well. Legs run all the way to the top of the side for stability
-
Basic Framing Complete
-
Notice the length of the neck, and shorter neck in next picture. Neck made it a little (4") too long
-
Detail work attached.
-
BODY:
-
¼" Masonite
-
½" MDF & Plywood Circles
-
½" MDF detailing
-
1-½" PVC split down the middle
-
HEAD
-
1X3 Framing, ¼" Masonite skin
-
½" Florist Foam Circles
-
Florist Foam Carving Details
-
PVC Cannons
Fully painted
Head Details
-
Entry/Exit Stairs, Including secret compartment for storing Jedi supplies
-
Built-In Shelving for storing Star Wars Legos
-
Window in front (next to head)
-
So we can check in on him without having to walk all the way around and climb up. 😎
Installed in the room, ready for invasion of Hoth!