The Dutilly Family: AT-AT Bed Complete!

Link: The Dutilly Family: AT-AT Bed Complete!

AT-AT Bed Completed: The Next Generation Has Begun

Mission Complete!

All Terrain Armored Transport installed!
6-½ weeks, about 60 hours of work.
  • 2X4 Framing, with ½" MDF top. CT was a huge helper
  • Basic Legs are 2X4 as well. Legs run all the way to the top of the side for stability
  • Basic Framing Complete
  • Notice the length of the neck, and shorter neck in next picture. Neck made it a little (4") too long
  • Detail work attached.
  • BODY:
  • ¼" Masonite
  • ½" MDF & Plywood Circles
  • ½" MDF detailing
  • 1-½" PVC split down the middle
  • HEAD
  • 1X3 Framing, ¼" Masonite skin
  • ½" Florist Foam Circles
  • Florist Foam Carving Details
  • PVC Cannons
Fully painted
Head Details
  • Entry/Exit Stairs, Including secret compartment for storing Jedi supplies
  • Built-In Shelving for storing Star Wars Legos
  • Window in front (next to head)
  • So we can check in on him without having to walk all the way around and climb up. 😎
Installed in the room, ready for invasion of Hoth!

Leave a Reply

Your email address will not be published. Required fields are marked *